Anyone can sell you a part. Henko sells a part with a serial number, a test record and a promise in the contract. Here is how every shipment is verified.

Insights

Article

2026-11-23

Two sets of gates, two different jobs

We run two sets of gates, and we name them differently on purpose. The Five Quality Gates are company-level: they decide which mills we buy from and what we are willing to put our name on. The Five Acceptance Gates are batch-level: they decide whether one specific consignment ships. This article is about the company-level gates. The batch-level gates are set out on our quality page.

The gates exist because of what we sell. Plungers, valve seats and inserts, by-pass tees and manifold assemblies for 2,000-2,500 HHP pumps are wear parts working in abrasive, high-pressure duty. Anyone can sell you one. We would rather sell you a part with a serial number, a test record and a replacement commitment written into the contract you sign.

Gate 1: Mill approval starts with an on-site audit

We do not approve a mill from a brochure. We visit the mill, audit it in person, and keep the audit report open to our customers. If you want to see the report for the mill that made your parts, ask - we would rather show it than describe it. A mill that will not host an audit does not become an approved source.

Gate 2: Evidence at every shipment

Every consignment is inspected against the purchase-order annex before it leaves the works, and every shipment carries a bound file. The standard eight documents are:

  • Material certificate to EN 10204 type 3.1 - heat number, plus measured chemistry and mechanical properties, signed by the mill's inspection representative.
  • Hardness report - the location, the test points and the gauge used, not just a pass mark.
  • Dimensional inspection record - the critical dimensions, with measured minimum and maximum values.
  • Alloy verification (PMI/XRF) - a per-lot check that the alloy elements match the specified grade.
  • Third-party inspection report - an independent company samples and witnesses the lot; the report carries a number you can verify with that company.
  • Batch acceptance certificate - our own signed certificate, citing the contract the lot belongs to.
  • Packing list and traceability sheet - heat number to lot number to serial number to box number.
  • Certificate of conformity - a one-page statement signed by Henko.

The discipline is simple: if a required document is missing, the lot is not inspected and does not ship. We do not ship first and send the paperwork later.

Gate 3: Promises live in contracts

Life and warranty commitments are stated only in the Warranty Terms Sheet annexed to the Sales Contract, and they are subject to its caps and exclusions. A marketing sentence that is not in the contract is not a commitment. That rule protects you as much as it protects us: it means the promise you can enforce is the one you have read.

Gate 4: Data is the proof

We record measured values, not tick marks. Every inspection line carries the reading, the unit, the gauge identity, the ambient temperature, the inspector and a timestamp. A tick mark tells you somebody looked. A number tells you what they saw. Pressure tests are recorded the same way - test pressure, hold time, pressure loss, medium temperature, witness - and the pressure-time curve is archived with the part record.

Gate 5: Try before you buy

Before any volume commitment, a trial consignment on one well or one pump lets the field decide. If you need a figure that would otherwise go into a contract as a life promise, we propose a bounded field trial instead: agreed duty conditions, agreed sample size, a written split of who measures what, acceptance criteria agreed in advance, conversion to volume if the criteria are met, and defined exit terms if they are not. The trial result is a conformance finding for that lot under those conditions. It is not sold afterwards as a life guarantee.

What the third-party report says - and what it does not

The independent inspection is done to a documented sampling plan: ISO 2859-1, general inspection level II, major AQL 1.0, single sampling, normal inspection. The acceptance and rejection numbers are filled in by the inspection body against its own copy of the standard; we do not print those figures ourselves.

Two boundaries belong in the same breath as the report. First, sampling inspection is sampling: it characterises the lot, it is not a performance guarantee on every individual part. Second, the file proves conformance at the moment of delivery - material, dimensions, hardness, coating, seal fit, pressure containment. It does not predict how long a part will last on your wellsite, because life is a function of your duty, not a fixed property of the part.

We hold no dealer appointment, and we do not claim certification by any standards body for ourselves or our suppliers. Trademark names on our site identify the equipment our parts fit; they do not imply endorsement.

What this buys you

Five company-level gates decide what we sell at all. Five batch-level gates decide whether your lot ships. Between them, the answer to "how is this verified" is never a slogan - it is a numbered report you can check, a curve you can read, and a contract you can enforce. Send us your pump model, pressure level and OEM part number, and the quotation comes back with the cross-reference and the evidence list attached.