The binder is part of the product

When a Henko crate arrives, inside it is a bound file - certificates, measured records, an inspection report and a traceability sheet. That file is not packaging filler. It is the documented half of what you bought. This article walks through it page by page: what each document proves, who signs it, and what the file deliberately does not claim.

The eight documents in every shipment

Whatever you order - plungers, seats and inserts, elastomer sets, by-pass tees, unions or manifold assemblies - the standard file contains eight items:

  1. Material certificate, EN 10204 type 3.1. Signed by the mill's inspection representative, it carries the heat number and the measured chemistry and mechanical properties of that steel - so certificate and metal can be matched to each other.
  2. Hardness report. Which location, which test points, which gauge. The mill measures; we re-measure on sample.
  3. Dimensional inspection record. Critical dimensions from the drawing, with measured minimum and maximum values - not a column of ticks.
  4. Alloy verification (PMI/XRF). A per-lot check that the alloy elements match the specified grade, by us or the third party.
  5. Third-party inspection report. An independent inspection company samples the lot and witnesses the checks. The numbered report can be verified with the company that issued it.
  6. Batch acceptance certificate. Our own certificate, signed by Henko, citing the sales contract this lot belongs to.
  7. Packing list and traceability sheet. The chain: heat number to heat-treatment lot to our lot number to serial number to box number.
  8. Certificate of conformity. A one-page Henko statement that the lot conforms to the purchase-order requirements.

They are bound in that order; the PDFs arrive with the crate.

Who signs what

Three parties contribute, and knowing which is which matters in a dispute:

  • The mill signs what only the mill can know: material certificate, heat-treatment records, coating process records, raw pressure-test curves.
  • Henko signs what is our promise to you: the batch acceptance certificate, the conformity statement, the packing and traceability sheets.
  • The independent inspection company signs the sampling and witness records: dimensional and visual checks, alloy verification, NDT and pressure-test witnessing.

If the same fact appears in three places and they disagree, the independent report outranks the mill's, and the mill's outranks ours. But responsibility does not shift: the certificates we hand you are our commitment, not the mill's.

Different parts, different pages

The eight core documents are the floor. The file then changes with what you bought:

  • Plungers add the coating proof - process, powder lot, measured thickness in microns with a measurement map - plus ultrasonic and magnetic-particle testing of the substrate before coating - coating changes what surface tests can do.
  • Valve bodies, tees and unions add the pressure-test record: test pressure, hold time, pressure loss, medium temperature, witness - and the archived pressure-time curve.
  • Valve seats with hard coating add coating thickness and process proof.
  • Elastomer sets do not get a type 3.1 certificate - that document class is for metals. Instead: the compound batch record with the supplier's certificate, measured Shore A hardness, dimensions and a 100 percent visual check. Where a part is not pressure-tested, the certificate says so and says why - a blank cell reads as an omission.

If a page is missing

The rule is blunt: no document, no inspection, no shipment. The hard documents - material certificate, hardness, dimensions, third-party report, acceptance certificate, packing and traceability - must be complete before release. A shipment does not go out on the promise that paperwork will follow. A few formal items can be corrected within a defined window, and every exception is logged. If a mill hands us a falsified report, the lot is rejected and the mill is suspended.

What you can witness

You do not have to take the file on faith. On a trial or on request, you can witness the sampling before the parts ship - the sampling record travels with the crate. Our inspector attends hydrostatic tests, and the pressure-time curve is archived with the part record. We provide written tightening-torque, cleaning and inspection-interval instructions and a pre-trial briefing; on-site support can be arranged. In a bounded field trial, both sides' measurements are fixed in the protocol in advance, so the conclusion rests on data both parties watched being collected.

What the file does not say

Two limits, stated plainly. First, the file proves conformance at the moment of delivery - material, dimensions, hardness, coating, seal fit, pressure containment. It does not predict field life and is not a durability guarantee: life depends on your duty, not on the binder. Second, the third-party report is a sampling inspection to a documented plan - ISO 2859-1, general inspection level II, major AQL 1.0 - and its acceptance and rejection numbers are filled in by the inspection body against its own standard text. Sampling characterises a lot; it is not a certificate on every individual part. And we claim no certification by any standards body for ourselves or our suppliers - the evidence in the binder is what we ask to be judged on.

Ask for the file before you order

Any supplier can attach a certificate to a crate. Ask whether it carries measured values or only verdicts, whether it names the gauge and the inspector, whether the traceability chain reaches your serial number, and what the contract says when a page is missing. Send us your enquiry and we will show you a sample file - the real kind, numbers and all.